- Oct 4, 2006
- 24
- 0
- 0
I'm confused. The June 2013 issue of PC shows the speed limit for vehicles towing trailers with a GVW of less than 3.5t as 80 mph on motorways. I understood that , irrespective of the actual GVW of your outfit, if your vehicle was capable of a GVW in excess of 3.5t, then the motorway limit was 55mph. Is this correct? Comments would be appreciated before I set sail.