M4 Closure 24-27 October.

Nov 11, 2009
25,083
9,072
50,935
The M4 will be closed in both directions between junctions 18 (Bath) to 19 (Bristol M32) from 7 pm on Friday 24 October until 6am Monday 27 October. It is the final stage of a new bridge being installed.

Happy travels ☹️
 
  • Like
Reactions: Dustydog
Jun 20, 2005
20,094
5,348
50,935
The M4 will be closed in both directions between junctions 18 (Bath) to 19 (Bristol M32) from 7 pm on Friday 24 October until 6am Monday 27 October. It is the final stage of a new bridge being installed.

Happy travels ☹️
That’s me stuffed😢Driving back from Pont Kemys on the Saturday!
 

Mel

Moderator
Mar 17, 2007
6,189
2,255
25,935
That’s me stuffed😢Driving back from Pont Kemys on the Saturday!
They open one road for you, only to close another. ☹️. Hope there is a sensible alternative route that is not full of motorway traffic.
Mel
 
Jul 18, 2017
16,415
5,252
50,935
I can see tailgates all the way back to Swindon or Newport depending which way you are travelling.
 
Nov 11, 2009
25,083
9,072
50,935
They open one road for you, only to close another. ☹️. Hope there is a sensible alternative route that is not full of motorway traffic.
Mel
Nice to dream. 😂

This is the last of the full closures caused by replacement of the worn out bridge. The last ones did cause major problems but the work did all complete on time for the M 4 to reopen on the Monday morning.
 
Mar 14, 2005
1,640
640
19,935
I think the diversion is via A46 to Pennsylvania then right at the roundabout towards Bristol then Ring Road to M32 and M4, if going West and reverse if going East, worst part is the single carraiageway through Warmley otherwise straightforward depending on volune of traffic.
 

TRENDING THREADS

Latest posts