Have not stayed on the site since this work started but only live 15miles from Ayr and after reading your posting went down last night and went round to the site. Looks terrible with the site practically surrounded with wooden hoardings. The construction traffic turns off the main drive and looks like it passes the site entrance. As you walked out of the site previously you could turn right and follow the path to the river and walk into the town, this is now blocked off. I don't know what the future holds for the site even when this work is completed but i think much of its appeal will be lost. Just wonder if this is why the CC didn't go ahead with the planned refurbishment earlier this year. Hope we will get some more comments regarding this as the site looked to be about 95% full last night.
William